baob2791
3 days agoSettling in
PreInstall Work??
I am a prospective new VM customer and after reading some of the preinstall woes i am concerned.
I ordered by VM setup on 31st July 2025, received all my contract info etc and even managed to setup and link my account using the bing method! I got a text message on the 2nd August 2025 advised that preinstall work was completed and I'm on track for my requested install of the 19th August 2025. So when I got back to my flat I checked the outside and as I am on the top floor i see no cables or brown boxes running up to my property unlike someone on the ground floor who has a brown VM box on there outside wall.
Should I be concerned???
My existing BB is due to be turned off on the 19th when the install is to be completed!
Thanks