Should I just cancel before it gets worse?
Signed up to VM on a fresh build house I am now renting (we are the first tenants) on the 18th July.
They sent someone to do preliminary works the very next day I believe so good sign.
Wait til the 2nd August which was the installation date - engineer shows up all the way from a 45 minute drive to tell me that the preliminary work was incorrect - they installed a coax cable instead of a fibre optic cable and that they will be in touch for a new install date.
I wait patiently and it is now 5th August (yesterday) and I am now a bit worried they've given up on me. So I call them up and they send a "fault technician" to check what needs to be done - when they should already know what needs to be done as we already know they installed the wrong cable. I pick the early time 8am to 1pm on the 6th August (next day) anyway.
It is now 12pm and no one has shown up and I am not feeling very optimistic. Looking around it seems that this is a common thing even seeing someone not having an installation done for over a year. I know this is a slippery slope but I wouldn't be surprised if thats the route I am heading down.
The problem is now that theres an ugly cable outside and those guys who set it up really didnt put the flooring back the way it was properly. If I cancel that'll all be for nothing.
Should I just go with someone else at this point? I used to be with community fibre back in London and I was never disappointed with them even once. Here it hasn't even been installed and I'm already considering calling it quits with these guys.
Let me know what you advise.