New install- Engineer visit and still on BT
Hi,
I'm due to have an engineer call at the beginning of August to see how it can all be routed through the front garden etc.
I have checked my BT contract and now realise it doesn't end until October. Is it possible to still go ahead with the install seeing as its different networks?
Also, do I have the right to cancel if what the engineer needs to do to the front is unfeasible?
Sorry, i couldnt find anything in the search, so thought id ask on here!
Many thanks
Usual advice on here would be to only cancel your existing BT service once you have got VM up and running fully to your satisfaction.
The reason for this is that VM can get bogged down with long delays if a problem arises with installing your connection for any reason.
Many people posting on here end up with no connection at all when they try to end one service on the same day VM said it would install (and then discover VM springs an installation delay on them).
You have a 14 day cooling off period which begins from the point when your service is activated. See section M of the T&Cs