Account Upgrade from M250-M350 Volt speed boost
Hello,
I have the M125 plan currently boosted by the Volt speed boost to M250. I have ordered an upgrade to the M350 plan via the Volt speed boost. I currently have the Hub 3.0, will this need to be replaced? If it's just a software thing, how long does Virgin normally take to do this?
I need a faster upload speed due to the length of time it currently takes for the uploading of video files, and the M350/M500 seem to have the same upload speeds. If it's still too slow then I guess the M500 volt speed boosted to the 1GB package will be the next potential option, but I understand that would need upgraded equipment.
TIA
Hi there dKFRq4aZp3sR
Thank you so much for your post and welcome to the community forums, it's great to have you with us.
A big thank you to our community team here for all their advise so far, and to confirm the Hub 3 is suitable for the 350 speeds. If you have made your order online it can take 7-10 working days to update, but any issues at all please do let us know and we will be happy to take a look with you.