Forum Discussion
No RepliesBe the first to reply
Related Content
- 7 months ago
Hi
Original installation was surface mounted across front driveway.
Having new driveway installed, existing cable/conduit needs to be longer to allow for it to be buried.
How do I arrange that please?
thanks
Tankstar