New installation (sort of)
Good afternoon all, totally new to this forum and to VM!
currently my son is living in my house but is moving out and we are moving back in. We’ve been in Greece for a while. My son has VM and is taking it with him to the new house. So far so good! I imagine that we will be ordering a VM package in the next day or so but I do have a question that I’d like to ask someone before we go ahead.
We are having a new drive installed in September. The installers say they will dig out, put in a base and then the imprinted concrete will go on top of that. It will be at a depth of around 10 inches. I don’t know if the cable that is already under the existing pebble drive is in conduit and if there is any slack or even how deep it has been buried! If the installer digs down too far the cable may then not be long enough. Can I get a new cable run to the house with some slack so that when the new drive is installed it doesn’t have to be dug up? I’m concerned that we get the install done now and then when the new drive goes in there is nothing we can do!
Dave.