Having tarmac laid over existing Virgin cables.
I am wanting to have this part of my drive tarmacked. As can be seen the conduit comes up before the end of the area to be covered, for the cables to going through the edging stone. Leaving bare cables exposed. The conduit will not push up right to the edge and is too high at this point anyway.
1. Will the cables and or conduit withstand the heat of tarmac?
2. It would be preferable if this cable could be re-routed lower? What ideas do people have please? What can Virgin installers do with this to improve?
Many thanks
I would suspect hot tarmac will not do the bare cable any good ! It would be better to bury that cable a bit deeper. In fact IMHO that whole job looks terrible, there should be no cables visible on either side of that kerbstone.
If you wait here a day or two a VM Mod will pick this up and discuss directly with you.