Permission to dig road
So I ordered VM on 9th Sept
I had engineers who came out on 21st Sept but said couldn't do the install as they couldn't find the pole.
The shop next door has VM connection and the installation engineer advised me that they would need to do a 2m dig to take a connection from the property next door to mine.
I am still waiting.
Every time I call VM (which is almost daily), all I get told is that its high priority, works are on going, but they don't know what works are being done. I can see no work is being done. I keep getting told my account manager will call me back, but nobody does. On the off chance I do get a call back, I get told they will chase it up with the other team and call me back, and guess what? Yep, no call back.
It is now affecting my business.
How long does this usually take? Its so annoying that there is no real, meaningful update or timeframe