on 19-07-2023 06:53
Hi. Just finishing off a loft conversion and will need the minibix cable moved from 1st floor to the loft. As I don't know the exact date I will need this, was just wondering roughly how long I need to give them a heads up?
Answered! Go to Answer
19-07-2023 09:49 - edited 19-07-2023 09:50
Just to point out If a cable is going above 1st floor height it will have to go internally. Virgin techs are not trained or insured to work externally above 1st floor heights.
I'm a Very Insightful Person, I'm here to share knowledge, I don't work for Virgin Media. Learn more
Have I helped? Click Mark as Helpful Answer or use Kudos to say thanks
19-07-2023 09:49 - edited 19-07-2023 09:50
Just to point out If a cable is going above 1st floor height it will have to go internally. Virgin techs are not trained or insured to work externally above 1st floor heights.
I'm a Very Insightful Person, I'm here to share knowledge, I don't work for Virgin Media. Learn more
Have I helped? Click Mark as Helpful Answer or use Kudos to say thanks
on 19-07-2023 16:20
Not a problem although it's currently entering at skirting board level and I need it at ceiling level as its blocking a piece of furniture at the moment. Once that is done it can run up through the eaves.
on 19-07-2023 16:32
@Mjrickett16 wrote:Not a problem although it's currently entering at skirting board level and I need it at ceiling level as its blocking a piece of furniture at the moment. Once that is done it can run up through the eaves.
You will just have to hope it is within the reach of their provided ladder. If it’s not they won’t do it.
I'm a Very Insightful Person, I'm here to share knowledge, I don't work for Virgin Media. Learn more
Have I helped? Click Mark as Helpful Answer or use Kudos to say thanks
on 19-07-2023 16:40
Or it could have the entry point moved from the left to the right side of the first floor, if that would be easier.
on 19-07-2023 17:07
Alternatively, if it suits, put in a piece of electrical conduit externally yourself with a draw rope inside so the VM tech can pull through the cable into the loft conversion without climbing up any ladders beyond first floor level.