Can anyone state how long it would take to move my existing 200mbps VM Broadband and Phone connected to a new area which is VM enabled via a pathway termination box, but not connected to the actual property, and if there is a fast track way of actioning it?
The length of time I am concerned about is when I take ownership of the new house and having my VM Broadband working.
I can dig a trench to the house from the pathway which would assist the install team.
I am presently in LE7 Leicester area and moving to LE13 Melton Mowbray area.