on 13-05-2022 10:28
Can anyone state how long it would take to move my existing 200mbps VM Broadband and Phone connected to a new area which is VM enabled via a pathway termination box, but not connected to the actual property, and if there is a fast track way of actioning it?
The length of time I am concerned about is when I take ownership of the new house and having my VM Broadband working.
I can dig a trench to the house from the pathway which would assist the install team.
I am presently in LE7 Leicester area and moving to LE13 Melton Mowbray area.
on 15-05-2022 16:53
Hi pkw5,
Thanks for posting. Have you spoken to the Movers team in relation to moving your services to the new address?
Best,
Need a helpful hand to show you how to make a payment? Check out our guide - How to pay my Virgin Media bill
on 15-05-2022 17:13
on 15-05-2022 17:23
Thanks. No I haven’t contacted the Movers Team yet as I haven’t got a moving date, it was just a preliminary enquiry to get an estimate of time.
I’m just concerned the house isn’t connected to the pathway vm lidded box, and would require a cabling team and a separate installation engineer.
on 15-05-2022 20:32
As a start, do some serious reading of similar threads on here about new connections that have required cables to be laid to the pavement. This will give you an understanding of the problems you will have to negotiate.
If your move dates are fixed you will almost certainly need a temporary broadband connection by 4g/5g until the Virgin service is working.
on 15-05-2022 21:18
Thanks for the advice.
on 16-05-2022 15:34
Hi @pkw5
Please don't send PM's unless asked 🙂
You'll need to speak to the Movers team who can go through this for you.
150 / 0345 454 1111 - best,
Need a helpful hand to show you how to make a payment? Check out our guide - How to pay my Virgin Media bill
on 18-05-2022 15:50
Hello pkw5,
Hope you are okay.
Just a quick message to see if you have been able to contact our Movers Team yet?
Gareth_L
on 18-05-2022 16:06
Gareth
I have been in touch with the movers team.
I wasn’t too sure what the guy was talking about, as he had a poor telephone voice, but I think he said he could get a line from the pathway connector to the property install ed before I actually move in? Otherwise it would be 2 weeks after I move in.
Does any of that sound correct?
on 20-05-2022 16:28
Hi pkw5,
If there is construction work needed then we would aim to make sure this is resolved before the installation yes 🙂
Alex_Rm