Hi,
We are due to have our installation on 02nd June however have some concerns about the installation given the possibility of requiring to drill into the house and route new cables.
We have tried to organise a site survey (as we know they can be conducted) but have had no luck. Can you help arrange a site survey before our installation? Time is ticking by rapidly now and we don't want to delay the installation if we can avoid it.
Thanks in advance
Ryan