We complete on a house on date X
But a pre-install team is scheduled for a few days before X.
I've clarified via text and on the phone now the points above and have been assured that the engineers will not step foot onto the grounds of the property.
But i wanted to post on here to double check if what i've been told is correct? And also i guess to have some sort of record that i've done everything i can to avoid some sort of legal issue.
I've tried looking for an email address or similar, but this is the best i can find.