cancel
Showing results for 
Search instead for 
Did you mean: 

When and How is a Site Survey arranged?

Derwentmailman
Dialled in

Looks like I am moving in on Friday this week.  I have already asked a while back re my likely installation and possible routing on cables to the outside omnibox from the outside T in the pavement the other side of my boundary wall in

NEW HOME 

I've seen many posts referencing a site survey being done.  Quickstart is not an option as this would be a new installation, so

Q1)  Is a site survey only arranged before phase 1 (the external connection to the omnibox) if the customer requests it or does Virgin automatically set it up for you in the ordering process where there has not been a previous installation at the property?

Q2)  And if it is down to me to request such a survey how do you go about it?

2 REPLIES 2

jbrennand
Very Insightful Person
Very Insightful Person
Have you tried the Pre-installation and Delivery team - they may have more info?

On.. 0800 052 1734

--------------------
John
--------------------

I do not work for VM. My services: HD TV on VIP (+ Sky Sports & Movies & BT sport), x3 V6 boxes (1 wired, 2 on WiFi) Hub5 in modem mode with Apple Airport Extreme Router +2 Airport Express's & TP-Link Archer C64 WAP. On Volt 350Mbps, Talk Anytime Phone, x2 Mobile SIM only iPhones.

Thanks will try this number before I place any order