cancel
Showing results for 
Search instead for 
Did you mean: 

Engineer didnt turn up

stephrobins1988
Joining in

Took day off work for engineer to come and install broadband and no one turned up even tho there was workmen in the street all day.

2 REPLIES 2

jpeg1
Alessandro Volta

There are usually two installation dates. Was the date you were given for initial cable work from the street to your house? If so that would be what you saw.  The internal connection and equipment installation will be a separate appointment when the outside work is done.

- jpeg1
My name is NOT Alessandro. That's just a tag Virginmedia sticks on some contributors. Please ignore it.

Zoie_P
Forum Team (Retired)
Forum Team (Retired)

hI Stephrobins1988,

Thank you for your post and welcome to our forums 🙂 

I am so sorry to hear this, as @jpeg1 has advised this may be a pre pull of cable for example before the actual installation.

Have you spoken to our team regarding this?
Zoie